Leroy, MI
(231) 846-1442

Take a look at our recent concrete and construction projects.

These are real jobs from around Leroy, Manton, Cadillac, Tustin, Reed City and Big Rapids. JDC usually returns calls and emails by the next business day.

Slabs and flatwork

  • Crew levelling a gravel base inside the forms beside a small home, pine trees behind
  • A long freshly finished concrete slab with edge forms still up and an orange cone at the edge, tree line behind
  • A large slab pour underway with a framed building rising behind it and a pump boom overhead
  • A brown two-car garage with a fresh concrete apron, caution tape strung across it, a lake behind
  • A newly poured walk and drive with a power trowel finishing the surface, cones set out, a pole-barn frame behind
  • A finished driveway pour behind caution tape, a pole-frame building in the background
  • A jointed concrete pad beside an outbuilding, control joints cut into the fresh surface
  • A poured concrete pad and walk beside a sided home
  • A long smooth concrete drive running to a green-doored pole building
  • A poured porch or stoop slab set on a block foundation
  • A decorative stamped dark patio behind a home, edged with a river-rock border

Foundations and block

  • A waterproofed block foundation with forms still standing beside a home
  • Block foundation walls going up by a lake, the crew's Ford trucks parked in the foreground
  • A block foundation seen from above, surrounded by autumn woods

Buildings and garages

  • A smooth finished concrete floor inside a large timber-frame building
  • A long brown-sided building with a green metal roof and a service door
  • A new chalet-style home with tall gabled windows and a blue metal roof
  • An A-frame style new home with a green roof and a deck
  • A garage with a fresh concrete apron and the crew's white Ford truck, partial JDC lettering on the door
  • The inside of a pole building with a fresh dark slab and open sides
  • A large smooth slab inside a pole building, a trailer parked outside
  • A pole-building frame with the roof sheathing going on
  • A tan steel-sided pole building with ladders leaned against it and house wrap showing
  • A maroon two-door garage on a new concrete apron in autumn
  • Pole barn truss framing going up, one worker small in the frame
  • Inside a pole building with a fresh slab, sunlight patterning through the open frame
  • Looking out through an open bay from inside a slab interior
  • A timber-frame home with a deck and stone accents

Got a job like one of these in mind?

Call (231) 846-1442 during the week, or leave your number and a J D C Construction representative calls you back the next business day.